The Lift-and-Release System Increases Panel Installation by 50%
Fast Panel-Landing System
|
Panel Erection
Easi-Set uses a proprietary erection method—Lift-and-Release – that
effectively speeds up panel installation. With the Lift-and-Release
system, SlenderWall panels can
be plumbed and aligned after the crane has unhooked and moved on
using a turn-of-nut connection. See Drawing Details E-1 through
E-4 in the Typical
Details for
more information on this system.
Easi-Set’s choice of experienced
erection companies must be PCI-qualified erectors, or have a minimum
of five years experience installing SlenderWall architectural precast
concrete panels. They place safety first as they set panels according
to required delivery sequences and schedules. They also carefully
coordinate site access and storage priorities with the general
contractor to maximize the number of panels set per day, minimizing
the overall erection time frame. Field crews carefully execute
the connection details according to the approved engineering design.
Lift-and-Release is
the only panel-landing system that makes the installation process
faster and easier (19 minutes per panel). Patented
Benefit: increases
panel installation rates by 50%